DOWNLOAD BROCHURE

Tridhaatu Aum

Redevelopment of Sri. Swati CHS

Stilt + 3 Podiums + 18 Floors

2 & 3 BHK

Behind Borba Devi Temple,
Chembur – Deonar Link Road,
Chembur Mumbai – 400088

11th floor WIP

ENquiRE NOW

 
 

Project approved for home loans from the following banks:

Living / Dining Room

  • Vitrified tiles
  • POP finished walls with luster paint
  • Ample electrical & communication points
  • Premium branded modular electrical fittings
  • Thick moulded wooden door frames & veneer finished doors
  • High quality anodized french windows with designer grills

Bedroom Suites

  • Planned for maximum cross ventilation and natural light
  • Vitrified tiles
  • Wooden flooring in master bedroom
  • Thick moulded wooden door frames & veneer finished doors
  • Ample electrical & communication points

Kitchen

  • Spacious and ergonomically designed kitchen layout with granite platform
  • Ample electrical points for appliances

Bathrooms

  • Elegantly designed for best use of space
  • Anti-skid flooring
  • Premium branded fittings & fixtures

Internal Amenities

EXTERNAL AMENITIES

  • Siesmic-resistant structure
  • High speed elevators with power back up
  • Video door phones for each flat with intercom facility
  • State-of-the-art firefighting facilities
  • Well planned parking
  • Special sanitation facilities for drivers and house helps

VALUE ADDITIONS

  • Temple at podium level
  • Podium garden
  • Clubhouse with sports & fitness centre
  • Grand lobby
  • Swimming Pool
  • Meditation room
  • Jogging track
  • Activity room
  • Drivers’ room with sanitation facilities at parking level
  • Well equipped children’s play area
  • Sewage Treatment Plant

ENERGY EFFICIENCY

  • Occupancy sensor in entrance lobby and common areas
  • Solar powered lighting in common areas aimed to bring down maintenance cost
  • French windows aimed at higher light transmission and lower heat absorption
  • Eco-friendly measures such as rainwater harvesting and wind power

External Amenities